To ensure economic viability of a project, we generally recommend:
• Minimum annual consumption of 400 MWh
• Minimum annual production of 250 MWh
• Minimum of 10-15 participants to diversify profiles
• Collective self-consumption rate of at least 30%
These thresholds may vary depending on local context, energy tariffs and available subsidies.

